Notice of Violation: Construction
Opened July 26, 2017 · Updated November 16, 2017
Per 2/8/17 online complaint: "Unit 101 at this address started remodeling without a permit. After getting a permit the owner did the remodel but did not follow the plans. There is supposed to be door on the west side. Instead there is a door on the south side which is within 1.5 feet of the property line, not the required 3 feet" since 05/2014***Work not per Permit 6417695 - see attached approved permit drawings (3 pages). Per complainant there is supposed to be door on the west side and instea
Status: Completed
View source recordComplaint: Construction
Opened February 13, 2017 · Updated July 24, 2017
Per 2/8/17 online complaint: "Unit 101 at this address started remodeling without a permit. After getting a permit the owner did the remodel but did not follow the plans. There is supposed to be door on the west side. Instead there is a door on the south side which is within 1.5 feet of the property line, not the required 3 feet" since 05/2014***Work not per Permit 6417695 - see attached approved permit drawings (3 pages). Per complainant there is supposed to be door on the west side and instea
Status: Completed
View source recordNotice of Violation: Construction
Opened April 25, 2014 · Updated August 19, 2014
Converting garage into a living area w/o permit. This building is a condominium. The owner of unit 101 on the ground floor is doing the work. ***Remodeling the garage in the main building next to the front door (not the little detached garage next to the street) into habitable space w/o permit & inspections. Garage door is open as they do the work. Contractor says he doesn't need a permit.***
Status: Completed
View source recordComplaint: Construction
Opened April 18, 2014 · Updated April 24, 2014
Converting garage into a living area w/o permit. This building is a condominium. The owner of unit 101 on the ground floor is doing the work. ***Remodeling the garage in the main building next to the front door (not the little detached garage next to the street) into habitable space w/o permit & inspections. Garage door is open as they do the work. Contractor says he doesn't need a permit.***
Status: Completed
View source record